Asbestos disturbance 999 + HSE 0300 003 1647 Suspected asbestos release
MaintenanceOS Emergency Flow
1. Emergency Repair Reported
• Tenant/contractor reports via portal, phone, or email
• Safety keywords (gas, fire, flood, collapse, electrical) → Auto-triggers Safety Latch
• Repair status: Safety Hold (cannot be assigned)
• Immediate notifications: All Admins + Safety Officer (email + SMS + Slack/Teams)
2. Safety Officer Review (Target: < 30 minutes)
1. Open repair → Safety Hold banner → "Review"
2. Assess: Is 999 already called? Is property evacuated?
3. If not already done → Call appropriate emergency service
4. Select qualified emergency contractor (Gas Safe, NICEIC, etc.)
5. Add mandatory clearance note
6. Clear Hold → Repair becomes Emergency priority
3. Emergency Assignment
• Only contractors with emergency availability and correct certifications shown
• Contractor must acknowledge within 30 minutes
• SLA: On site within 2–4 hours (gas: 1 hour)
• Contractor receives: Property access, tenant contact, safety notes
4. On Site & Resolution
• Contractor updates: En Route → On Site → Completed
• Photos mandatory for emergency repairs
• If further danger found → New Safety Latch triggered
• Completion notes must include: Cause, fix, certification references
5. Post-Emergency
• Safety Officer reviews within 24 hours
• Tenant welfare check (automated prompt)
• Compliance certificates updated (Gas Safe, EICR, etc.)
• Incident logged in Reports → Safety Incidents
Specific Emergency Protocols
Gas Leak / Carbon Monoxide
1. Tenant instruction (auto-sent): "Open windows, don't use switches, evacuate, call 0800 111 999"
2. Safety Latch: Gas Emergency (highest priority)
3. Contractor: Gas Safe registered (CKR1 for boilers)
4. Post-fix: Gas Safe certificate uploaded, CO alarm tested
5. Never clear hold without Gas Safe engineer
Major Water Leak / Flood
1. Safety Latch: Water + Electrics if near electrical
2. Contractor: Plumbing + Electrical (or two contractors)
3. Priority: Stop water → Make safe → Dry → Repair
4. Document: Photos of damage, moisture readings
5. Insurance: Auto-creates claim reference if enabled
Fire Damage
1. 999 first — MaintenanceOS never delays fire response
2. Safety Latch: Fire Safety (structural, electrical, smoke)
3. Contractor: Fire restoration specialist + Structural engineer if needed
4. Post-fix: Fire risk assessment review, EICR, building control notification
Structural Instability
1. Safety Latch: Structural
2. Evacuate if imminent risk — 999
3. Contractor: Structural engineer + Groundworks
4. Building Control notification required
5. No re-entry until engineer certifies safe
No Heating in Winter (Oct–Mar)
1. Safety Latch: Winter Heating (if tenant vulnerable)
2. Contractor: Gas Safe / OFTEC (heating engineer)
3. SLA: 4 hours (vulnerable), 24 hours (standard)
4. Temporary heaters provided if >24 hours (policy dependent)
Out-of-Hours Coverage Standard plans: Emergency contractor network with 24/7 availability
• Contractors opt-in to emergency rota
• Rota managed in Settings → Contractors → Emergency Rota
• Escalation: Primary → Secondary → On-call Manager
Professional/Enterprise: Dedicated 24/7 support desk option
Emergency Spend Authority
Role Limit (per repair) Approval
Safety Officer £2,000 Self-authorised (note required)
Admin £5,000 Self-authorised
Manager £500 Requires Admin approval
Auto-approve (config) £250 None Above limits: Emergency authorisation via Slack/Teams/email to Admin — reply "APPROVE [amount]" within 15 minutes.
Communication Templates Tenant notification (auto):
"EMERGENCY REPAIR: We've received a report of [issue] at your property. Emergency services [have been/are being] contacted. A qualified contractor will attend within [timeframe]. Your safety is our priority. Reply HELP for assistance." Contractor brief (auto):
"EMERGENCY JOB: [Property address] — [Issue description]. Safety Latch: [type]. Tenant: [name, phone, vulnerability flags]. Access: [instructions]. Required cert: [Gas Safe/NICEIC/etc.]. Target on-site: [time]. Reply ACK to accept."
After-Action Review Every emergency repair triggers a review (within 7 days):
1. Timeline reconstruction
2. Communication effectiveness
3. Contractor performance
4. Tenant outcome
5. Process improvements
6. Record in Reports → Safety Incidents → After-Action
Next Steps
---
Pre-launch documentation. Features and workflows may change before general availability.
WorkSmartOS
MaintenanceOS is the property-maintenance product. Pre-launch — not commercially generally available.
WorkSmartOS by Chapelgate Technologies. © 2026 Chapelgate Limited